How do engineering changes work?

Change bills of materials through change orders that are reviewed, approved and applied as a new revision — and who can do what.

A bill of materials that production relies on shouldn't change under people's feet. With Engineering, a change is proposed on an engineering change order (ECO): what to add, remove or change. It is reviewed and approved, and applying it creates the next revision of the bill — the old one is kept, and you can always see what changed and why.

The life of a change

StatusMeaning
DraftBeing written. Only a draft can be edited.
In ReviewSubmitted for review. Frozen, so reviewers see exactly what will be applied.
ApprovedSigned off and ready to apply.
AppliedThe new revision of the bill of materials exists. Kept as a record and can't be changed.
CancelledDropped. The bill of materials was never touched.

Who can do what

Engineering is its own app with its own roles, kept apart from Manufacturing: an engineer doesn't need access to production, and an operator never writes a change order. In the user's access rights, give the Engineering role User to engineers — they write change orders and engineering documents, and can read the bills of materials, operations and work centers those refer to, but not edit them. Manager can also delete change orders and documents. See How do I add users and choose what they can access?

➡️ Next: How do I propose a change to a bill of materials?