Why can't I edit or apply this change order?
What the messages mean when a change order can't be edited, submitted or applied.
| Message | Why, and what to do |
|---|---|
| This change has been submitted. Reset it to draft to make changes … | A change in review or approved is frozen so the approval means something. Click Reset to Draft, edit, and submit it again. |
| This change is closed and kept as an audit record … | It was applied or cancelled. Create a new change order. |
| This change order has nothing to apply … | Add a component change, an operation change or a document first. |
| … references components or operations that are no longer on the bill of materials … | The bill of materials changed after this change order was written. Reset it to draft and pick the lines again. |
| This change order has incomplete changes … | A line doesn't say what it changes — a component to add, or a line to remove or update. Complete or delete it. |
| I can't edit a bill of materials directly | With the Engineering User role, bills of materials are read-only by design: change them with a change order. |
Was this article helpful?