How do I add operations and work instructions to a bill of materials?
Describe the steps a product is built in, where each happens, how long it takes and what the operator should do.
Operations are the steps a product goes through — cut, assemble, inspect. Each one happens at a work center and becomes a work order on every manufacturing order, so you can plan the time and follow the work.
- Open the bill of materials and go to the Operations tab. Click Add an item.
- Enter the Operation Name and choose the Work Center (1).
- Enter the times: Setup Time (min) and Cleanup Time (min) once per run, and Duration per Unit (min) (2) for each unit made.
- Write the steps under Work Instructions (3), or attach a drawing as the Worksheet Document. Operators see them on the work order.
- Click Save. Add the next operation the same way.

Operations run in the order they're listed; drag a row to reorder them.

Steps that run side by side
- Blocked By — name the operations that must finish before this one can start. Once one operation names another, any operation with nothing in Blocked By may run alongside the others.
- Or Any Of — other work centers that can do the same job. Planning gives the operation to whichever is free first.
Consume a component at a step
On the Components tab, set a component's Consumed in Operation to the step that uses it. It is then taken from stock when that work order is marked Done, instead of when the whole order is produced.