How do I set up Manufacturing and its work centers?

Choose the manufacturing features you need, add the work centers where products are built, and decide how components reach the production floor.

Manufacturing works out of the box: make a bill of materials, raise a manufacturing order, produce. Work centers, operations and the other features are switched on when your shop needs them.

Choose the features

  1. Go to Manufacturing → Setup. The Manufacturing tab opens.
  2. Under Features, switch on what you need, then click Save.

The Features panel of the Manufacturing settings with Work Orders, Unbuild Orders, By-Products and Block Production When Short marked

FeatureSwitch it on when…
Work Orders (1)A product is built in steps at different stations (cut, assemble, inspect) and you want to plan and time each one. Adds the Work Orders menu and an Operations tab on bills of materials.
Unbuild Orders (2)You sometimes take a finished product apart and put its components back in stock. Adds the Unbuild Orders menu.
By-Products (3)A run produces something useful besides the main product, such as offcuts you can sell.
Block Production When Short (4)On by default: an order can't be produced until every component it uses is in stock. Turn it off to let production go ahead and leave it to each component's own Allow Negative Stock setting.

Under Lead Times, the Production Start Buffer starts orders raised from demand (a sales order, a replenishment rule) this many extra days early, on top of each product's own manufacturing lead time.

Add your work centers

A work center is a place where work is done — a machine, a bench, an assembly line. You need them only with Work Orders on.

  1. In Manufacturing → Setup, click Work Centers under Setup, then New.
  2. Enter the Work Center Name and choose its Resource Type: Machine, Human or Combined.
  3. Set its Capacity (1) — how many units it works on at once — and its Time Efficiency (%) (2). At 85%, every operation takes a little longer than planned.
  4. Choose a Work Schedule (3) for its shifts, or set Working Hours per Day (4) if it has none.
  5. Enter its Cost per Hour (5) so time spent there is counted in what a product costs. Then click Save.

A work center form with Capacity, Time Efficiency, Work Schedule, Working Hours per Day and Cost per Hour marked

When a machine breaks down, click Report a Stop on its work center. The time it was down is listed under Downtime, and it lowers the OEE (%) figure shown on the work center.

Decide how components reach production

With Multi-Warehouses on in Inventory, go to Inventory → Setup, click Warehouses and open the warehouse. On the Shipments tab:

  • Component Supply (1) — Direct picks components straight to production; Two-Step stages them first; Three-Step adds a quality check on the way.
  • Finished Goods (2) — Direct puts what you make straight into stock; Two-Step holds it first, then stores it.

The Shipments tab of a warehouse with Component Supply and Finished Goods marked

Related: How do I create a bill of materials?