How do I report a breakdown?

Raise a maintenance request for equipment that needs fixing, with its priority and schedule.

Go to Maintenance → Requests and click New.

A maintenance request with Equipment, Type, Priority, Team, Technician and Scheduled Start marked 1 to 6

  1. Describe the problem in a line, and choose the Equipment.
  2. Type — Corrective for a breakdown. (Preventive requests are usually created by plans.)
  3. Priority — Low, Medium, High or Urgent.
  4. Team and Technician fill in from the equipment. If the equipment names no technician, the team's assignment method picks one when you save.
  5. Under Scheduling, set the Scheduled Start and Duration (hours); the Scheduled End follows.

Put what you know on the Description tab, and the steps to follow on Instructions. Click Save.

While a corrective request is open, its equipment shows Under Maintenance, so everyone can see it is out of action.

➡️ Next: How do I work and close a maintenance request?